How Long Does It Take to Get New Countertops?
Updated August 18, 2026 · Premier Marble Kitchens, Stamford, CT
Quick answer
With a factory-direct fabricator, new countertops typically take about 1 to 3 weeks from template to installation. The timeline depends on the material, the size of your project, and the fabricator's schedule. The templating and installation appointments themselves usually take only a few hours each.
The typical timeline
Template (day 1)
Once your cabinets are installed and level, a technician takes precise measurements of your space. Templating takes as little as 30 minutes for a small job, or a few hours for a large kitchen.
Fabrication (about 1 to 2 weeks)
Your stone is cut and finished to the template. This is the part that sets the overall timeline, and in-house fabrication keeps it efficient.
Installation (a few hours)
The finished countertops are installed, usually in a single appointment of a few hours depending on the size of the job.
The short version
About 1 to 3 weeks from template to installation
What affects the timeline
Material and slab availability
If your slab is in stock, the process moves faster. A special-order or exotic slab can add time.
Project size and details
A large kitchen with an island, a waterfall edge, or many cutouts takes longer to fabricate than a small, simple layout.
Schedule
The fabricator's current workload and your appointment availability affect how quickly template and install dates are set.
Frequently asked questions
How long does it take to install countertops?
The installation appointment itself usually takes only a few hours. The full process, from template to finished installation, typically takes about 1 to 3 weeks with a factory-direct fabricator.
What is the fastest way to get new countertops?
Have your cabinets installed and level, pick your slab early, and keep your edge and layout simple. Working with a local fabricator that cuts in-house also shortens the timeline.
How long does templating take?
Templating takes as little as 30 minutes for a small job, or a few hours for a large kitchen. A decision maker over 18 should be present.
How long after templating until installation?
Fabrication usually takes about 1 to 2 weeks after templating, depending on the material and project size, then installation is scheduled.
Can I get countertops installed in Stamford quickly?
Yes. Premier Marble Kitchens fabricates in-house in Stamford, CT, so the typical timeline is about 1 to 3 weeks from template to installation. Start with a free estimate to get on the schedule.